Case Study:  Process and Development
 


UC Davis River Truss Requirements



The University of California Davis Hydrology Department had a need...

...develop lightweight hydraulic jump testing equipment that will enable them to gather large amounts of data in the field. By working closely with customer personnel early in the process, we were able to develop a reasonable set of requirements that firmly guided the hands of Pitzer Consulting engineers during the design and simulation process.



PreviousNext


Pitzer Consulting can help design better products through simulation -
CALL 310-973-2577.


Pitzer Consulting: Marca Botbash Arena